Industrial fire suppression systems are designed to control, suppress or extinguish a fire in a defined area. The right approach depends on the hazard, the facility and the emergency plan. Use the questions below to prepare site information for a qualified fire-protection review of the system, supporting equipment, maintenance program and emergency procedures.
What does an industrial fire suppression system do?
An industrial fire suppression system is intended to control, suppress, or extinguish a fire within the area it is designed to protect. Depending on the arrangement, it can work alongside alarms, detection, water supplies, pumps, controls, emergency shutdowns, and manual response procedures. Its purpose and limits should be clear to the people responsible for the facility.
Suppression is only one layer of fire protection. The Canadian Centre for Occupational Health and Safety, or CCOHS, describes a fire safety plan as a property-specific document that covers evacuation, fire prevention and methods to limit fire damage. Its guidance recommends detailed maintenance procedures for fire-protection systems and information on the type, location, and operation of emergency systems.[1]
Why industrial sites need a hazard-specific review
A new material, a revised production line, an equipment enclosure, a building addition, or a change in how a space is used can affect the fire protection needed at a site.
Start with the conditions at the site. CCOHS recommends that a fire-safety review consider the layout, entry and exit points, building use, the way materials are stored and used, water or fire-department connections, alarm systems, sprinkler systems, and other relevant factors.[1] For an industrial facility, that discussion should also account for the process, potential ignition sources, the people who may be in the area, the equipment that needs protection, and how the site will respond if an alarm or system activates.
That review is not a substitute for an engineered design or a code determination. It gives the owner, operator, or health, safety and environment (HSE) lead facts to bring to qualified fire-protection professionals and the authority having jurisdiction, meaning the authority responsible for applying the relevant code. Local fire-code requirements vary, so CCOHS advises checking with the relevant jurisdiction, municipality, or local fire department.[1]
How do different suppression approaches fit different conditions?
Different suppression approaches have different technical standards. For example, NFPA 11 addresses low-, medium-, and high-expansion foam systems, including fixed, semi-fixed, and portable systems for interior and exterior hazards.[2] NFPA 2001 addresses total-flooding and local-application clean-agent extinguishing systems. It is intended for people who purchase, design, install, test, inspect, approve, operate and maintain those systems.[3]
NFPA develops consensus standards; they are not automatically Canadian law.[6] In Canada, provincial and territorial authorities are responsible for adopting and enforcing the national model codes.[5] Confirm which code, referenced standard edition and contractual requirements apply to the site with the authority having jurisdiction and qualified fire-protection professionals.
Define the hazard and protection objective before choosing a system. A useful review asks:
- What materials, fuels, or processes create the fire scenario under consideration?
- Is the protected area open, enclosed, outdoors, or connected to other operating spaces?
- What equipment, utilities, controls, or operations could be affected by a discharge?
- What water supply, alarm, detection, shutdown, and access arrangements support the system?
- What must people do when an alarm sounds or a system is impaired?
Document these details for the technical review rather than choosing a system on equipment type alone.
What should a site review include?
A practical review connects protection equipment to the fire safety plan and the work happening on site. For review planning, gather drawings, equipment lists, alarm and control information, and maintenance records. Note differences between these records and current storage, process, occupancy and access conditions for the qualified review.
CCOHS identifies several plan elements that are relevant to this exercise: emergency procedures for alarm notification and evacuation, assigned fire-safety duties, employee training, fire-protection-system maintenance, and instructions about the location and operation of emergency systems.[1] If the system is expected to support a specific response procedure, personnel should know what that procedure is and when it applies.
For a focused consultation or engineering review, prepare the information already available: site and system drawings, the protected area’s use, a list of materials and processes, the current fire safety plan, recent inspection or service records, and any known impairments or planned work. Where records are incomplete, note the gap instead of assuming the system arrangement.
Inspection, testing and maintenance
A system’s presence does not establish its current readiness. Inspection, testing, and maintenance check equipment condition and identify work that needs follow-up. NFPA describes NFPA 25 as the baseline for inspection, testing, and maintenance of water-based fire-protection systems. Confirm the edition and requirements applicable to the site.[4] [5]
Inspection and test intervals vary by system and component. Confirm the required frequencies and methods under the applicable code and referenced standards with the authority having jurisdiction and qualified fire-protection personnel. Also check the equipment manufacturer’s instructions and the facility’s operating requirements. NFPA’s water-based maintenance guidance includes component-specific schedules and manufacturer-required maintenance.[7] CCOHS provides general fire-protection inspection guidance, but it is not a component-specific testing schedule.[1]
Keep inspection, test, impairment, repair, and return-to-service records in a form that the people responsible for the site can review. When a condition changes, update the plan, drawings, or work instructions that depend on it.
When should an industrial suppression arrangement be revisited?
Schedule a review when the conditions that informed the original arrangement no longer match the site. Practical review triggers include a new process or material, a change in storage, a renovation, a change in building use, modifications to utilities or water supply, or an update to emergency procedures.
A known system impairment needs prompt attention under the site’s applicable impairment procedures, rather than waiting for a scheduled review. NFPA’s guidance for water-based systems addresses both planned and emergency impairments and the need to limit time out of service.[8]
Before a shutdown, expansion or commissioning activity, confirm who is responsible for each action, which records are current and which questions need a qualified technical or jurisdictional answer.
Discuss your industrial fire and safety requirements
For questions about available fire and safety services, discuss your industrial fire and safety requirements.
Frequently asked questions
Is a fire suppression system the same as a fire safety plan?
No. A suppression system is an equipment-based protection measure. A fire safety plan covers a broader set of measures, including evacuation, prevention, assigned duties, training, maintenance procedures, and information about emergency systems.[1]
What information should be ready before a suppression-system review?
Bring current site and system information, including the space’s use, materials and processes, available drawings, alarm or suppression equipment details, maintenance records, and known changes or impairments. CCOHS specifically identifies site layout, storage and use of materials, connections, alarms, and sprinklers as items to consider in a property review.[1]
How often should industrial fire suppression systems be inspected?
The answer depends on the system, component and applicable requirements. NFPA 25 addresses inspection, testing and maintenance of water-based fire-protection systems. Confirm the applicable edition and component-specific schedule rather than applying a generic interval.[4] [5]
Do foam and clean-agent systems use the same standard?
No. NFPA 11 covers low-, medium-, and high-expansion foam systems, while NFPA 2001 covers total-flooding and local-application clean-agent fire-extinguishing systems. The system type and hazard call for their own technical and jurisdictional review.[2] [3]
Sources
- Canadian Centre for Occupational Health and Safety, Fire Protection.
- National Fire Protection Association, NFPA 11: Standard for Low-, Medium-, and High-Expansion Foam.
- National Fire Protection Association, NFPA 2001: Standard on Clean Agent Fire Extinguishing Systems.
- National Fire Protection Association, NFPA 25: Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems.
- National Research Council Canada, Model code adoption across Canada.
- National Fire Protection Association, Codes and standards.
- National Fire Protection Association, Maintaining Your Building’s Fire Sprinkler System.
- National Fire Protection Association, Impairment Procedures for Sprinkler Systems That Are Out of Order.