Emergency Response Planning and Fire Plans

Total Group develops emergency response plans and fire safety strategies for residential, industrial and other operating environments. The work can cover fire evacuation procedures or a broader emergency response strategy, depending on the hazards, people, site layout and operating conditions you need to address.

Emergency response plans and fire safety plans serve different purposes

An emergency response plan organizes how a workplace responds to emergencies that may require rescue or evacuation. A fire safety plan focuses on fire hazards, fire-protection measures and the actions people must take if a fire occurs. They may share information, but they are not automatically the same document. The final structure should match the site, the hazards and the authority or project requirement that applies.

For an Alberta workplace, Part 7 of the Occupational Health and Safety Code identifies plan elements such as potential emergencies, response procedures, emergency equipment and personal protective equipment, training, emergency facilities, fire protection, alarms and communications, first aid, rescue and evacuation procedures, and designated rescue or evacuation workers. The Alberta government’s planning toolkit also emphasizes that affected workers must be involved and that the plan must be communicated, practised and updated.

What the planning work can address

Total Group can assess the information available for your operation and develop a plan or fire-safety strategy around the agreed scope. Depending on the request, that may include:

  • credible fire, medical, weather, utility, security or site-specific emergency scenarios;
  • alarm and emergency communication arrangements;
  • evacuation routes, assembly locations and accountability responsibilities;
  • rescue and evacuation roles, alternates and training needs;
  • fire-protection equipment, emergency facilities and access information; and
  • response records, reporting responsibilities, review dates and change triggers.

A fire safety plan may also connect site hazards with prevention and control measures, fire-department notification, evacuation procedures and responsibilities. The exact content depends on the facility and the governing requirement. Natural Resources Canada’s fire-safety guidance, for example, requires a site-specific plan for licensed explosives storage and calls for regular review and review when circumstances change. That guidance is not a universal rule for every Canadian workplace.

Alberta code context and local authority

Canada’s National Fire Code is a model code. It must be adopted by a regulatory authority before it has legal effect, and provinces or territories may amend it for regional needs. Alberta currently identifies the National Fire Code – 2023 Alberta Edition, second printing, as its code in force. Other provinces, territories, municipalities and project authorities may use different editions, amendments or processes.

For that reason, a plan can support a compliance review without proving that the site complies. The authority having jurisdiction (AHJ), such as the applicable municipal or provincial safety-code authority, retains responsibility for interpreting and enforcing the adopted requirements. Where a project requires qualified engineering, design authority or AHJ approval, those steps remain separate from preparing a written plan. Total Group does not present plan writing as regulatory approval or a guarantee of emergency response.

Owner responsibilities after the plan is prepared

The owner or employer remains responsible for making the plan work at the site. This includes confirming the hazards, providing accurate drawings and contacts, assigning people to roles, supplying appropriate equipment, communicating procedures to workers, arranging training and drills where required, and keeping records. Review the plan after a significant change in occupancy, process, layout, staffing, equipment, hazardous materials, access arrangements or emergency contact information. Incident findings and exercises may also show that an update is needed.

On a site with multiple employers, responsibilities may be shared or coordinated through a prime contractor or another designated party. Property managers, affected workers and local responders may hold information that the plan needs. Their participation should be arranged by the site owner or responsible employer and documented where appropriate.

When to request a plan review or update

Arrange a discussion when opening or changing a facility, adding a higher-risk process, revising a floor plan, changing emergency equipment or contacts, identifying a new rescue or evacuation concern, or preparing for a project or authority review. A request may also focus on a specific gap, such as fire evacuation procedures, emergency communications, assembly and accountability, or coordination with the local fire department.

What to prepare for an inquiry

Send the site address and jurisdiction, a description of the operation, occupancy and shifts, available floor or site plans, worker and visitor information, known hazards, fire-protection systems, emergency equipment, existing procedures, contact lists, previous drills or incident records, and the reason for the request. Identify whether you need a new plan, an update, a review against a stated requirement or help organizing a practical intake. If an AHJ, insurer, landlord, prime contractor or project has provided comments, include those documents.

Discuss your emergency planning requirements

Contact Total Group with the site details, the planning need and any applicable authority or project documents. The team can confirm the available scope and the information needed to develop or review the plan. For related fire-protection services, visit the Fire Services hub.